king street construction

Toronto starts to transform King St. for pilot project

It's time to get prepared for the King Street Pilot Project, which will soon transform one of Toronto's primary streets.

Construction on King Street for the transit and pedestrian-based project has already begun. Crews were spotted today removing traffic lines and installing new signage along the street in preparation for the pilot's debut.

Construction workers unload machinery at King and Bay Streets. Photo by Michael Ott.

The project is officially set to open November 12, and will severely limit the amount of vehicular traffic on King Street thanks to a slew of new restrictions.

The pilot stretches from Jarvis to Bathurst, turning this stretch of King into what's being referred to as a "transit priority zone."

Construction workers install a new "no left turn" sign at Church and King. Photo by Michael Ott.

New rules for traffic will including forced turns at key intersections and bike boxes for cyclists.

Many curbside sections of King are blocked off with construction fencing. Photo by Michael Ott.

Drivers, pedestrians, cyclists, and transit riders should double check the new route ahead of its scheduled start day to make sure they know how to travel down King.

Lead photo by

Michael Ott


Latest Videos



Latest Videos


Join the conversation Load comments

Latest in City

Cliffside park in Toronto is a hidden gem with some of the most stunning views

Toronto neighbourhood gets new garbage bins after years of complaining

Factory that was once a fixture on Toronto's skyline is now completely demolished

Toronto park connected to huge trail system is a hotspot for glimpsing wildlife

Toronto may finally start cracking down on out of control rat problem

Shocking hit-and-run video in Toronto shows driver slamming person into side of truck

Street literally set on fire outside of Toronto's sketchiest McDonald's

TTC route is changing for the second time in a month due to excessive gridlock